BRIDGES

Project: Yeadon Way, Blackpool – 2020

Appointment

  • Principal Designer
  • CDM Advisor
  • Site Safety Inspections

 

 

Scope of Work

  • Stabilisation of embankments
  • Road remediation
  • Replacement of drainage and street furniture

Significant Hazards

  • Piling
  • Bulk Haulage
  • Crushing
  • Plant & Machinery
  • Excavation
  • Traffic Management

Project: Lambrigg Stoney Beck Bridge, Kendal – 2017

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Environmental Management
  • Construction Phase Plan
  • Safe System of Work
  • Environmental Risk Assessment

 

Scope of Work

  • Sympathetic repairs to bridge at Lambrigg Foot, Stoney Beck, due to hydrostatic pressure damage from brook in spate following heavy rain.

Significant Hazards

  • White claw crayfish
  • Single wall hessian cofferdam
  • Riverbed ecology
  • Pollution from plant and machinery re: aquatic toxicity, potential for bioaccumulation and biodegradability of hydraulic fluid, therefore, use of bio-fuel plant
  • Silt migration
  • Phase 1 Habitat Survey
  • Flood Management (Ordinary Watercourse Flood Defence Consent)
  • Consents from: Cumbria County Council
  • Licence from Natural England

Project: Plymouth Road Bridge, Blackpool – 2016 – 2017

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Design Team Meetings
  • Review of all project documents
  • Site Safety Inspections
  • Liaison with Wilde Consulting Engineers, Network Rail and Story Contracting

Scope of Work

  • Replacement of existing bridge decks with the installation of new decks and refurbishment programme
  • Decks to be supported by new reinforced concrete bearing shelf cast onto existing abutments/piers

Significant Hazards

  • Partial Demolition
  • Temporary Works
  • Heavy Lifting Operations
  • Railway Blockades
  • Road Closure & Traffic Management
  • Services Diversions
  • Public Interface
  • Night Shifts
  • Nosie Abatement
  • Work at Height
  • Temporary Footbridge
  • Designed Scaffolding

Project: St. Mary’s Way Footbridge, Stockport – 2016

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Site Safety Inspections
  • Appointed Person – review of 1000t mobile crane Lift Plans

 

 

Scope of Work

  • Carriageway widening
  • Retaining wall and bridge foundations
  • New bridge delivery
  • Demolition/dismantling of former footbridge spanning St. Mary’s Way
  • Installation of new bridge

Significant Hazards

  • Traffic Management
  • Temporary Works
  • Retaining Wall
  • Sheet Piling
  • Heavy Lifting Operations
  • Road Closure
  • Services Diversions
  • Public Interface
  • Night Shifts
  • Nosie Abatement
  • Work at Height
  • Demolition
  • Burning and Welding
  • Work at Height