BRIDGES
Project: Yeadon Way, Blackpool – 2020
Appointment
- Principal Designer
- CDM Advisor
- Site Safety Inspections
Scope of Work
- Stabilisation of embankments
- Road remediation
- Replacement of drainage and street furniture
Significant Hazards
- Piling
- Bulk Haulage
- Crushing
- Plant & Machinery
- Excavation
- Traffic Management
Project: Lambrigg Stoney Beck Bridge, Kendal – 2017
Appointment
- Health & Safety Consultant
- CDM Advisor
- Environmental Management
- Construction Phase Plan
- Safe System of Work
- Environmental Risk Assessment
Scope of Work
- Sympathetic repairs to bridge at Lambrigg Foot, Stoney Beck, due to hydrostatic pressure damage from brook in spate following heavy rain.
Significant Hazards
- White claw crayfish
- Single wall hessian cofferdam
- Riverbed ecology
- Pollution from plant and machinery re: aquatic toxicity, potential for bioaccumulation and biodegradability of hydraulic fluid, therefore, use of bio-fuel plant
- Silt migration
- Phase 1 Habitat Survey
- Flood Management (Ordinary Watercourse Flood Defence Consent)
- Consents from: Cumbria County Council
- Licence from Natural England
Project: Plymouth Road Bridge, Blackpool – 2016 – 2017
Appointment
- Health & Safety Consultant
- CDM Advisor
- Design Team Meetings
- Review of all project documents
- Site Safety Inspections
- Liaison with Wilde Consulting Engineers, Network Rail and Story Contracting
Scope of Work
- Replacement of existing bridge decks with the installation of new decks and refurbishment programme
- Decks to be supported by new reinforced concrete bearing shelf cast onto existing abutments/piers
Significant Hazards
- Partial Demolition
- Temporary Works
- Heavy Lifting Operations
- Railway Blockades
- Road Closure & Traffic Management
- Services Diversions
- Public Interface
- Night Shifts
- Nosie Abatement
- Work at Height
- Temporary Footbridge
- Designed Scaffolding
Project: St. Mary’s Way Footbridge, Stockport – 2016
Appointment
- Health & Safety Consultant
- CDM Advisor
- Site Safety Inspections
- Appointed Person – review of 1000t mobile crane Lift Plans
Scope of Work
- Carriageway widening
- Retaining wall and bridge foundations
- New bridge delivery
- Demolition/dismantling of former footbridge spanning St. Mary’s Way
- Installation of new bridge
Significant Hazards
- Traffic Management
- Temporary Works
- Retaining Wall
- Sheet Piling
- Heavy Lifting Operations
- Road Closure
- Services Diversions
- Public Interface
- Night Shifts
- Nosie Abatement
- Work at Height
- Demolition
- Burning and Welding
- Work at Height