CIVILS
Project: Enterprise Zone Link Road – Blackpool – 2022
Appointment
- Health & Safety Consultant
- CDM Advisor
Scope of Work
- Full Depth Construction
- Lane Division
- Drainage
Significant Hazards
- LIVE Carriageway – 30mph to 40mph
- Cycle Lane
- Traffic Management
- Services & Utilities
- Plant & Machinery
- COSHH
- Excavations
- Public Presence
Project: Project Amber Phase II – Blackpool – 2020 / 2022
Appointment
- Principal Designer
- CDM Advisor
Scope of Work
- Innovative Highway Treatment Works to Strategic Road Network
Significant Hazards
- LIVE Traffic
- Traffic Management
- Services & Utilities
- Plant & Machinery
- COSHH
- Excavations
- Public Presence
- Night Shifts
Project: Lancaster University Health Innovation Centre – 2020
Appointment
- Health & Safety Consultant
- CDM Advisor
- Site Safety Inspections
Scope of Work
- Cut & Fill, bulk earth work, drainage, landscaping, swales, infrastructure, roads, footpaths, cycle path, road widening, junctions, traffic signals, street lighting, surfacing and white lining
Significant Hazards
- Multiple contractors
- Adverse weather conditions
- Working adjacent to LIVE 25,000v OHL – Network Rail
- Traffic Management
- Heavy plant and machinery
- Deep excavations
- Buried asbestos pipes
- Busy A6 carriageway
Project: Blackpool Airport Emergency Route – 2020
Appointment
- Principal Designer
- CDM Advisor
- Health & Safety Consultant
- Site Safety Inspections
Scope of Work
- Works to cover the construction of paved emergency access road and an unpaved security perimeter road, both Airside.
Significant Hazards
- Airside Security
- Airfield electrics
- Ecology
- Drainage & Flood Risk Strategy
- Logistics
- Excavations
- Planing
- Crushing
Project: St. Mary’s Way/Hempshaw Ln Retaining Wall – Stockport – 2015
Appointment
- Health & Safety Consultant
- CDM Advisor
- Site Safety Inspections
Scope of Work
- Widening of St. Mary’s Way as part of the Stockport MBC Town Centre Access Plan, to include bulk excavations, retaining wall, new footbridge, additional carriageway lane, surfacing, white lining etc.
Significant Hazards
- Live carriageway
- Traffic Management
- Sheet Piling
- Underground services
- Lifting Operations
- Heavy plant and machinery
- Logistics
(see BRIDGES for footbridge installation)
Project: A580 Park & Ride Scheme – Manchester – 2015
Appointment
- Health & Safety Consultant
- CDM Advisor
- Site Safety Inspections
Scope of Work
- Stabilization, cut & fill, grading and formation of new Park & Ride Scheme for car passengers and bus route along the A580 East Lancashire Road
Significant Hazards
- Live carriageways
- Traffic Management
- Soil stabilization
- Underground services
- M60 support columns
- Heavy plant and machinery
- Logistics