CIVILS

Project: Enterprise Zone Link Road – Blackpool – 2022

Appointment

  • Health & Safety Consultant
  • CDM Advisor

 

Scope of Work

  • Full Depth Construction
  • Lane Division
  • Drainage

Significant Hazards

  • LIVE Carriageway – 30mph to 40mph
  • Cycle Lane
  • Traffic Management
  • Services & Utilities
  • Plant & Machinery
  • COSHH
  • Excavations
  • Public Presence

Project: Project Amber Phase II – Blackpool – 2020 / 2022

Appointment

  • Principal Designer
  • CDM Advisor

 

Scope of Work

  • Innovative Highway Treatment Works to Strategic Road Network

Significant Hazards

  • LIVE Traffic
  • Traffic Management
  • Services & Utilities
  • Plant & Machinery
  • COSHH
  • Excavations
  • Public Presence
  • Night Shifts

Project: Lancaster University Health Innovation Centre – 2020

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Site Safety Inspections

 

Scope of Work

  • Cut & Fill, bulk earth work, drainage, landscaping, swales, infrastructure, roads, footpaths, cycle path, road widening, junctions, traffic signals, street lighting, surfacing and white lining

Significant Hazards

  • Multiple contractors
  • Adverse weather conditions
  • Working adjacent to LIVE 25,000v OHL – Network Rail
  • Traffic Management
  • Heavy plant and machinery
  • Deep excavations
  • Buried asbestos pipes
  • Busy A6 carriageway

Project: Blackpool Airport Emergency Route – 2020

Appointment

  • Principal Designer
  • CDM Advisor
  • Health & Safety Consultant
  • Site Safety Inspections

Scope of Work

  • Works to cover the construction of paved emergency access road and an unpaved security perimeter road, both Airside.

Significant Hazards

  • Airside Security
  • Airfield electrics
  • Ecology
  • Drainage & Flood Risk Strategy
  • Logistics
  • Excavations
  • Planing
  • Crushing

Project: St. Mary’s Way/Hempshaw Ln Retaining Wall – Stockport – 2015

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Site Safety Inspections

 

 

Scope of Work

  • Widening of St. Mary’s Way as part of the Stockport MBC Town Centre Access Plan, to include bulk excavations, retaining wall, new footbridge, additional carriageway lane, surfacing, white lining etc.

Significant Hazards

  • Live carriageway
  • Traffic Management
  • Sheet Piling
  • Underground services
  • Lifting Operations
  • Heavy plant and machinery
  • Logistics

(see BRIDGES for footbridge installation)

Project: A580 Park & Ride Scheme – Manchester – 2015

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Site Safety Inspections

 

 

Scope of Work

  • Stabilization, cut & fill, grading and formation of new Park & Ride Scheme for car passengers and bus route along the A580 East Lancashire Road

Significant Hazards

  • Live carriageways
  • Traffic Management
  • Soil stabilization
  • Underground services
  • M60 support columns
  • Heavy plant and machinery
  • Logistics