DEMO

Project: Jones Village Bakery, Northwich 2019 – 2020

Appointment

  • Principal Designer
  • CDM Advisor
  • Review of contractor’s documentation
  • Site Safety Inspections
  • Pre – Start Meeting

 

Scope of Work

  • Compound & Site Set Up
  • Removal of business equipment and items
  • Full demolition down to slab
  • Excavate and lift slab for disposal
  • Re-grade ground with 6F2

Significant Hazards

  • Occupied business adjacent
  • Traffic Management
  • Logistics
  • Mechanical high reach work
  • Services & Utilities
  • Asbestos Containing Materials
  • Gas main diversion
  • Weather conditions/wind
  • Other construction work going on around the site area

Project: Royal Clarence Hotel, Exeter 2017 – 2019

Appointment

  • Principal Designer
  • Design Team Meetings
  • Health & Safety Consultant
  • CDM Advisor
  • Review of contractor’s documentation
  • Site Safety Inspections
  • Lift Plan reviews

 

 

Scope of Work

  • Fire damage remedial work
  • Demolition
  • Complex Temporary Works
  • Scaffolding
  • Piling
  • Underpinning
  • Structural stabilisation
  • Remote structural monitoring
  • Restoration and conservation work

Significant Hazards

  • Adjacent occupied streets and businesses
  • Listed Status
  • Traffic Management
  • Logistics
  • Work at Height
  • Demolition
  • Compartmentation
  • Complex Temporary Works
  • Security
  • Underground wells and culvert
  • Removal of heavy fuel oil tanks
  • Piling & underpinning
  • Lifting Operations

Project: Smithers Rapra, Shropshire – 2016

Appointment

  • Health & Safety Consultant
  • Site Safety Inspections
  • Demolition Planning & Management
  • Principal Designer
  • CDM Advisor

 

 

Scope of Work

  • Clear away and partial demolition for immediate retrieval of insurance documents in fire safe
  • Asbestos Surveying and Personal & Ambient Monitoring

Significant Hazards

  • Unstable structures
  • Demolition spec excavator entry to fire damaged areas
  • Services
  • Dust, noise and vibration
  • Occupied site
  • Gas supply
  • Nitrogen cylinders
  • ACMs in fire debris
  • Hazardous Substances
  • Sensitive site
  • Nearby RAF airfield
  • Weather conditions/wind loading

Project: ITAC Adhesives, Manchester 2015 – 2016

Appointment

  • Principal Designer
  • Health & Safety Consultant
  • CDM Advisor
  • Review of all contractor’s documents
  • Site Safety Inspections

 

 

Scope of Work

  • Fire damage reinstatement
  • Demolition
  • Relocating of plant
  • New build
  • New external slab
  • New plant installation

Significant Hazards

  • Dangerous Substances & Explosive Atmospheres site (DSEAR)
  • ATEX Directive
  • Tanker earthing
  • Fire & Explosion Risk
  • Occupied operational site
  • Local school and homes
  • Demolition and cold cutting
  • Hazardous Substances Inventory
  • Forklift Trucks