FIRE

Project: Garret Hall – Tyldesley – 2022

Appointment

  • Principal Designer

 

Scope of Work

  • Survey
  • Site Safety Scoping Survey & PCI

Project Issues

  • Structural Integrity
  • Services & Utilities
  • Sharps (Glass)
  • COSHH
  • Loose Fire Timber Debris
  • Access Over Bridge
  • ACMs

Project: Jones Village Bakery – Wrexham – 2019

Appointment

  • Health & Safety Consultant
  • CDM Advisor

 

Scope of Work

  • Full Demolition to BS6187:2011

Project Issues

  • LIVE Services (Gas & Electric)
  • Unstable Structure
  • Heavy Plant
  • Exclusion Zones
  • Occupied Site
  • Traffic Management

Project: Samual Garside House, Barking – 2019

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Review of contractor’s documentation

 

Scope of Work

  • Response to balcony fire and co-ordination of contractors and review of health & safety documentation
  • Site Safety Scoping Survey & Report

Project Issues

  • Occupied streets
  • Traffic Management
  • Logistics
  • Work at Height from MEWPS
  • Work sequences
  • Compartmentation
  • Reoccupied apartments

Project: Rudheath Academy, Northwich 2018 – 2020

Appointment

  • Principal Designer
  • CDM Advisor
  • Review of contractor’s documentation

 

 

Scope of Work

  • Make Safe
  • Strip Out
  • Partial Demolition
  • Full reinstatement

Significant Hazards

  • Occupied school
  • Traffic Management
  • Logistics
  • Work at Height
  • ACMs
  • Weak floors

Project: Wharfside Apartments, Wigan 2015 – 2016

Appointment

  • Principal Designer
  • Health & Safety Consultant
  • CDM Advisor
  • Design Team Meetings
  • Review of all contractor’s documents
  • Review of Lift Plans
  • Site Safety Inspections

 

Scope of Work

  • Fire damage reinstatement to timber frame structure
  • Drying out
  • Sequenced reinstatement
  • Early warning FD & A system
  • Liaise with Canal & Rivers Trust
  • Liaise with Greater Manchester Fire & Rescue Service

Significant Hazards

  • Partial Demolition
  • Temporary Works
  • Lifting Operations
  • Canal basin and pollution
  • Work at Height
  • Designed Scaffolding
  • Protection of existing circuits
  • Protection of adjacent blocks
  • Sequenced reinstatement of part wall compartmentation
  • Exposed timber frame after stripping out and drying out, and fire risk.

Project: Crathorne Hall Hotel, North Yorkshire 2014 – 2015

Appointment

  • Health & Safety Consultant
  • Site Safety Inspections
  • Appointed Person – review of mobile crane Lift Plans
  • Advanced Scaffold Inspections

 

Scope of Work

  • Make Safe
  • Temporary services including heating
  • Strip out
  • Partial demolition
  • Full reinstatement

Significant Hazards

  • Unstable chimneys
  • Temporary Works
  • Lifting Operations
  • 2 mobile cranes
  • Services
  • Work at Height
  • Demolition
  • Drying out
  • Decontamination
  • Work at Height