FIRE
Project: Garret Hall – Tyldesley – 2022
Appointment
- Principal Designer
Scope of Work
- Survey
- Site Safety Scoping Survey & PCI
Project Issues
- Structural Integrity
- Services & Utilities
- Sharps (Glass)
- COSHH
- Loose Fire Timber Debris
- Access Over Bridge
- ACMs
Project: Jones Village Bakery – Wrexham – 2019
Appointment
- Health & Safety Consultant
- CDM Advisor
Scope of Work
- Full Demolition to BS6187:2011
Project Issues
- LIVE Services (Gas & Electric)
- Unstable Structure
- Heavy Plant
- Exclusion Zones
- Occupied Site
- Traffic Management
Project: Samual Garside House, Barking – 2019
Appointment
- Health & Safety Consultant
- CDM Advisor
- Review of contractor’s documentation
Scope of Work
- Response to balcony fire and co-ordination of contractors and review of health & safety documentation
- Site Safety Scoping Survey & Report
Project Issues
- Occupied streets
- Traffic Management
- Logistics
- Work at Height from MEWPS
- Work sequences
- Compartmentation
- Reoccupied apartments
Project: Rudheath Academy, Northwich 2018 – 2020
Appointment
- Principal Designer
- CDM Advisor
- Review of contractor’s documentation
Scope of Work
- Make Safe
- Strip Out
- Partial Demolition
- Full reinstatement
Significant Hazards
- Occupied school
- Traffic Management
- Logistics
- Work at Height
- ACMs
- Weak floors
Project: Wharfside Apartments, Wigan 2015 – 2016
Appointment
- Principal Designer
- Health & Safety Consultant
- CDM Advisor
- Design Team Meetings
- Review of all contractor’s documents
- Review of Lift Plans
- Site Safety Inspections
Scope of Work
- Fire damage reinstatement to timber frame structure
- Drying out
- Sequenced reinstatement
- Early warning FD & A system
- Liaise with Canal & Rivers Trust
- Liaise with Greater Manchester Fire & Rescue Service
Significant Hazards
- Partial Demolition
- Temporary Works
- Lifting Operations
- Canal basin and pollution
- Work at Height
- Designed Scaffolding
- Protection of existing circuits
- Protection of adjacent blocks
- Sequenced reinstatement of part wall compartmentation
- Exposed timber frame after stripping out and drying out, and fire risk.
Project: Crathorne Hall Hotel, North Yorkshire 2014 – 2015
Appointment
- Health & Safety Consultant
- Site Safety Inspections
- Appointed Person – review of mobile crane Lift Plans
- Advanced Scaffold Inspections
Scope of Work
- Make Safe
- Temporary services including heating
- Strip out
- Partial demolition
- Full reinstatement
Significant Hazards
- Unstable chimneys
- Temporary Works
- Lifting Operations
- 2 mobile cranes
- Services
- Work at Height
- Demolition
- Drying out
- Decontamination
- Work at Height