FLOOD

Project: Bollington – Macclesfield – 2019

Appointment

  • Health & Safety Consultant
  • CDM Advisor

 

 

Scope of Work

  • Emergency installation of temporary stone ballast gabions, in 1- ton bags to retain existing stone wall, undermined by strong, rapid river currents during heavy rainfall event

Significant Hazards

  • Work at Height
  • Lifting Operations
  • Working above water
  • Road Closure
  • Fall Arrest System with Davit Arm

Project: The Daffodil Hotel & Spa – Grasmere – 2016

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Site Safety Inspections

 

 

Scope of Work

  • Strip out & reinstatement of flood damaged hotel and spa at the ground floor level

Significant Hazards

  • Occupied premises with staff
  • Site Traffic Management
  • Decontamination
  • Temporary Electrics

Project: Standfast & Barracks – Lancaster – 2015

Appointment

  • Principal Designer
  • CDM Advisor
  • Environmental Advisor
  • Health & Safety Consultant
  • Site Safety Inspections

 

 

Scope of Work

  • Storm Eva, heavy rainfall flooding events during late Winter 2015 and early 2016; leading to reinstatement of textile and fabric printing business; established in 1924

Significant Hazards

  • Chemicals
  • Asbestos Containing Materials
  • Operational Plant
  • Drainage
  • Logistics
  • Fire Evacuation
  • Hazardous Substances

Project: Windermere Marina Village – Bowness on Windermere – 2009

Appointment

  • Health & Safety Consultant
  • Site Safety Inspections

 

Scope of Work

  • Strip out & reinstatement of flood damaged hotel and spa at the ground floor level

Significant Hazards

  • Occupied premises with staff
  • Site Traffic Management
  • Decontamination
  • Temporary Electrics