Project: Cringle Road – Manchester – 2022 / 2024
Appointment
- Principal Designer
- Health & Safety Consultant
- CDM Advisor
Scope of Work
- Development of 52no. new homes
Significant Hazards
- Services & Utilities
- Drainage
- Ground Conditions
- Section 38
- Traffic Management
- Logistics
- Traffic Management
- Ecology & Environment
- Temporary Works
- Sequencing
- Deliveries
- Lifting Operations
- Work at Height
Project: Canal Wharf House, Slate Wharf – Castlefield – 2022
Appointment
- Principal Designer
Scope of Work
- Construction of New Build 4 storey / 24-unit PT Concrete Frame Apartments
Significant Hazards
- Canal
- Services & Utilities
- Busy Location
- Residential Area
- Tower Crane
- Temporary Works
- Concrete Pumping
- Plant & Machinery
- Section 50
- Excavations
- Work at Height
Project: Chiddingfold Surgery, Surrey – 2019
Appointment
- Principal Designer
- CDM Advisor
- Review of contractor’s documentation
- Site Safety Inspections
Scope of Work
- Complete demolition of fire damaged building down to slab
- New build to existing footprint and previous design
Significant Hazards
- Remote country site
- Public Rights of Way
- Small, occupied village
- Narrow country roads
- Children present at occupied adjacent houses
- Logistics/Deliveries
- Work at height
- Lifting Operations
Project: High Hundowe, Kendal 2018 – 2019
Appointment
- Principal Designer
- Health & Safety Consultant
- CDM Advisor
- Review of contractor’s documentation
- Site Safety Inspections
- Lift Plan review
Scope of Work
- Fire damage sympathetic reinstatement to Listed period property in Cumbria
Significant Hazards
- Weather conditions/wind load
- Listed Status
- Traffic Management
- Logistics
- Work at Height
- Demolition
- Temporary Works
- Security
- Lifting Operations
Project: Riverside Mill, Glossop 2016 – 2018
Appointment
- Principal Designer
- Health & Safety Consultant
- CDM Advisor
- Design Team Meetings
- Review of all contractor’s documents
- Review of Lift Plans
- Site Safety Inspections
Scope of Work
- Partial demolition of fire damaged and derelict former mill building
- Strip out
- Refurbishment into new apartments
- New build homes
Significant Hazards
- Footbridge closure
- Narrow access road
- NHS facility adjacent
- River at end elevation
- Services & Utilities
- Demolition
- Noise, dust and fumes
- Vibration
- Piling
- Basement tanking
- Work at height
Project: 101 The Embankment, Greengate, Manchester 2015 – 2018
Appointment
- Health & Safety Consultant
- CDM Advisor
- Incident Investigator
- Site Safety Inspections
- Appointed Person – review of Lift Plans
Scope of Work
- Demolition
- Bulk earth works
- Reduced Level Excavations
- Piling
- Pile Caps
- Ring Beam
- Drainage
- RC Walls and Formations
- Concrete pour to all decking and car park levels
- Pile Cropping
Significant Hazards
- Asbestos in made ground
- Demolition
- Heavy plant and machinery
- Tight site footprint
- Cementitious material
- Work at height
- Concrete pumping
- Temporary Works
- Falsework
- Formwork
- Confined Spaces
- Lifting Operations