NEW

Project: Cringle Road – Manchester – 2022 / 2024

Appointment

  • Principal Designer
  • Health & Safety Consultant
  • CDM Advisor

 

 

Scope of Work

  • Development of 52no. new homes

Significant Hazards

  • Services & Utilities
  • Drainage
  • Ground Conditions
  • Section 38
  • Traffic Management
  • Logistics
  • Traffic Management
  • Ecology & Environment
  • Temporary Works
  • Sequencing
  • Deliveries
  • Lifting Operations
  • Work at Height

Project: Canal Wharf House, Slate Wharf – Castlefield – 2022

Appointment

  • Principal Designer

 

 

Scope of Work

  • Construction of New Build 4 storey / 24-unit PT Concrete Frame Apartments

Significant Hazards

  • Canal
  • Services & Utilities
  • Busy Location
  • Residential Area
  • Tower Crane
  • Temporary Works
  • Concrete Pumping
  • Plant & Machinery
  • Section 50
  • Excavations
  • Work at Height

Project: Chiddingfold Surgery, Surrey – 2019

Appointment

  • Principal Designer
  • CDM Advisor
  • Review of contractor’s documentation
  • Site Safety Inspections

 

 

Scope of Work

  • Complete demolition of fire damaged building down to slab
  • New build to existing footprint and previous design

Significant Hazards

  • Remote country site
  • Public Rights of Way
  • Small, occupied village
  • Narrow country roads
  • Children present at occupied adjacent houses
  • Logistics/Deliveries
  • Work at height
  • Lifting Operations

Appointment

  • Principal Designer
  • Health & Safety Consultant
  • CDM Advisor
  • Review of contractor’s documentation
  • Site Safety Inspections
  • Lift Plan review

 

 

Scope of Work

  • Fire damage sympathetic reinstatement to Listed period property in Cumbria

Significant Hazards

  • Weather conditions/wind load
  • Listed Status
  • Traffic Management
  • Logistics
  • Work at Height
  • Demolition
  • Temporary Works
  • Security
  • Lifting Operations

Project: Riverside Mill, Glossop 2016 – 2018

Appointment

  • Principal Designer
  • Health & Safety Consultant
  • CDM Advisor
  • Design Team Meetings
  • Review of all contractor’s documents
  • Review of Lift Plans
  • Site Safety Inspections

 

Scope of Work

  • Partial demolition of fire damaged and derelict former mill building
  • Strip out
  • Refurbishment into new apartments
  • New build homes

Significant Hazards

  • Footbridge closure
  • Narrow access road
  • NHS facility adjacent
  • River at end elevation
  • Services & Utilities
  • Demolition
  • Noise, dust and fumes
  • Vibration
  • Piling
  • Basement tanking
  • Work at height

Project: 101 The Embankment, Greengate, Manchester 2015 – 2018

Appointment

  • Health & Safety Consultant
  • CDM Advisor
  • Incident Investigator
  • Site Safety Inspections
  • Appointed Person – review of Lift Plans

 

 

Scope of Work

  • Demolition
  • Bulk earth works
  • Reduced Level Excavations
  • Piling
  • Pile Caps
  • Ring Beam
  • Drainage
  • RC Walls and Formations
  • Concrete pour to all decking and car park levels
  • Pile Cropping

Significant Hazards

  • Asbestos in made ground
  • Demolition
  • Heavy plant and machinery
  • Tight site footprint
  • Cementitious material
  • Work at height
  • Concrete pumping
  • Temporary Works
  • Falsework
  • Formwork
  • Confined Spaces
  • Lifting Operations